Hail seasons and roof replacement
A hard hail cell can work through Stonehenge in ten minutes and leave a hundred roofs needing replacement. A Stonehenge roofing crew takes one standard unit at the head of the drive for a week or two, and whole Stonehenge streets order in the same two weeks. We stage extra units for Stonehenge after a storm rather than waiting for the calls to arrive.
Flat and low-slope roofs across Stonehenge mean tear-off, membrane and coating work rather than a simple shingle swap. Those Stonehenge jobs run longer than a pitched roof and the crews stay on site through the week.
Insurance repair inside the house
Water that gets past a Stonehenge roof does its damage in the ceilings and the walls below. A Stonehenge restoration crew keeps a unit on the driveway with a handwashing station, since the household bathroom is off limits while the work is under way.
Those Stonehenge rentals run three to eight weeks depending on the adjuster and the trades. We hold a fixed service day on a Stonehenge repair job so nobody is chasing the schedule mid-claim.
Gravel yards, walls and the dry months
Most Stonehenge front yards are gravel and rock, which gives a unit a firm surface anywhere on the property. Block walls around the Stonehenge back yards are too narrow at the gate for a unit to pass, so the driveway is the working answer.
Spring wind funnels down the older Stonehenge streets with nothing much to slow it. Every Stonehenge unit is staked or ballasted, and we set it in the lee of the garage wall where the drive allows. Summer heat on a Stonehenge roof job also argues for a shorter service interval than the crew size alone would suggest.
